Mull mast gets go ahead

Want to read more?

At the start of the pandemic in March we took the decision to make online access to our news free of charge by taking down our paywall. At a time where accurate information about Covid-19 was vital to our community, this was the right decision – even though it meant a drop in our income. In order to help safeguard the future of our journalism, the time has now come to reinstate our paywall, However, rest assured that access to all Covid related news will still remain free.

To access all other news will require a subscription, as it did pre-pandemic. The good news is that for the whole of December we will be running a special discounted offer to get 3 months access for the price of one month. Thank you for supporting us during this incredibly challenging time.

We value our content and access to our full site is only available with a  subscription. Your subscription entitles you to 7-day-a-week access to our website, plus a full digital copy of that week’s paper to read on your pc/mac or mobile device.  In addition, your subscription includes access to digital archive copies from 2006 onwards.

Just want to read one issue? No problem you can subscribe for just one week (or longer if you wish).

Already a subscriber?

 

Subscribe Now

Plans to install a 20-metre communications tower on Mull have been approved by council chiefs.

Project consultants WHP Limited want to build the lattice-style tower on land north of Catherine’s Loch.

No objections have been received from the public and council officials confirmed last week they were happy for the structure to go ahead.

A report said: ‘The requirement for a new telecoms base station within this area is to cover the unserved residential premises in and around Lochbuie and to cover the C54 single track road which runs along the north bank of Loch Uisg between Lochbuie and Kinlochspelvie continuing towards Fellonmore.

‘The prior notification relates to the installation of a 20 metre high tower housed within a fenced equipment compound and other relevant associated works.’

The report outlined that the Town and Country Planning Order of 1992 grants planning permission for new ground-based telecommunications masts up to 25 metres where they are not within ‘designated areas’, such as national scenic areas, national parks or conservation areas.

The document continued: ‘Although, in this case, the proposed mast is below 25 metres in height and the development does not fall within any ‘designated areas’, the proposal was ‘called in’ for prior approval to allow Historic Environment Scotland (HES) to submit comments.

‘Although HES had no comments to make on the proposal, it recommended advice be sought from West of Scotland Archaeology Service (WoSAS).

‘WoSAS recommend an archaeological watching brief should be imposed to protect any potential archaeological issues raised by the proposals. Whilst the tower will be visible from the wider locale the topography of the site will assist with its integration in the landscape.

‘The design of the mast is a relatively slim, innocuous structure of relatively modest height, proposed in a landscape where electrical grid infrastructure is not uncommon, which, together, will help reduce the perceived impact of the proposed tower. Therefore, the siting and design of the proposed mast is considered acceptable.’